Skip to main content
CorningCustomer feedback

A commenter praises Corning engineers for providing strong support by spending hours on the phone putting together a Bill of Materials for a first-time data center bid.

Source: Autobound Signal API · 81 signals tracked for Corning · updated

Get Corning's live signals in Claude or ChatGPT, or by API

AskWhat changed at Corning this week? Use Autobound signals for corning.com.

What happened

Post: "I was asked to bid a data center."

Source

RedditOct 30, 2026By u/gippp

r/estimators

I was asked to bid a data center.

upvotes
9
comments
24

Post

Division 27. We have never done a datacenter. Here are the broad strokes: Midwest location ~400,000 sqft ~5000' of three tiered cable tray ~30 edge data rooms with 3-6 panduit floor cabinets each APC UPS and smart PDU in each cabinet Two tiered ladder rack in each data room ~1000 cat6A cables for wifi, cameras, biometric credential readers, and staff work stations. Panduit for cable, patch panels, cable management. No mention of warranty. Literally no mention of fiber to connect these data rooms in the plans which is weird. One of the tiers of cable tray is specifically for fiber. I'm guessing the tenants provide their own fiber in accordance to their own specifications? Does anyone have any experience with these things? If so, what did you wish you knew before taking one on?

Extracted from these lines

  • [comment u/n8pea] On my first one I was able to spend a couple hrs on the phone with the engineers at Corning who put the BoM together - they were happy to do it.

reddit.com/r/estimators/comments/1xjto2a/i_was_asked_to_bid_a_data_ce...Read the full source

Comments on the post

5 of 24 comments
  • “Div 26 and mission critical is all I do anymore! Biggest advice is that you can’t put in enough lost time. OT fatigue, site size, trade stacking, safety, parking, so many things just drag the work down.”

    u/PancakesAlways23 points · Oct 30, 2026View

  • “Do you know the GC well? Depending on the level of design (which is rarely complete) Have a good call with your contact at the GC and a then what they are looking for. Rough budget? Solid defendable number? Is this a real bid? Those are all very different pricing strategies and you could be stressing too much depending on what the GC is looking to get out of you. Sometimes you gotta move forward”

    u/6174gunner10 points · Oct 30, 2026View

  • “Got time for RFIs? Got any manufacturer contacts? On my first one I was able to spend a couple hrs on the phone with the engineers at Corning who put the BoM together - they were happy to do it.”

    u/n8pea3 points · Oct 31, 2026View

  • “fiber being missing is usually normal, the tenant or a separate low voltage package pulls that, but get it in writing as an exclusion or an rfi so it doesn't land on you later. for the takeoff i'd count the tray runs by tier and fittings separately, since elbows, risers and drops at each data room eat way more labor than the straight footage suggests. same for the 1000 cat6a drops, price per drop”

    u/AshamedParamedic69302 points · Oct 31, 2026View

  • “I bid $1 billon.”

    u/Advanced-Donut93652 points · Oct 31, 2026View

Extracted by Autobound

From the Signal API record
Signal
Customer feedback

What this signalsUser posts often show product pain before it reaches reviews or churn.

Subreddit
r/estimators

The full record

From the Signal API record

Numbers

Mentions
1

Details

Timing
Completed
Category
Support
Virality
Somewhat high
Post kind
Text
Prominence
Aside
Company's role
Vendor

Topics and mentions

Topics

  • datacenter
  • engineering support
  • bom

Extraction

Sentiment
Positive
Detected
Oct 30, 2026
signal_type
reddit-company
signal_subtype
customerFeedback

Use this data

Get every Reddit signal for Corning and the companies you sell to, in the tools you already use.

  1. Ask Claude about it

    Connect Autobound to Claude, Claude Code or Cursor with MCP. Then ask: “What changed at Corning this week?”

  2. Send it to your own tools

    The Signal API returns Reddit signals for any list of companies as JSON, for your CRM, warehouse or app.

  3. Try it free

    Sign up and spend your free credits on the companies you sell to.

    Start Free1,000 free credits

The API returns more than this page shows

This page shows a preview. The full reddit-company record in the Signal API and MCP can also have these 8 fields. Some fields are empty for some signals.

Company

  • linkedin_urlValue in the API
  • industriesValue in the API
  • employee_count_lowValue in the API
  • employee_count_highValue in the API
  • revenueValue in the API
  • descriptionValue in the API

Signal

  • signal_nameValue in the API
  • associationValue in the API
Show the full JSONThe record on this page and the API request

GET /v1/signals/28f52377-6e1c-5a01-a771-8239c7e63e6b returns this record as JSON. POST /v1/companies/enrich returns every signal for corning.com.

{
  "signal_id": "28f52377-6e1c-5a01-a771-8239c7e63e6b",
  "signal_type": "reddit-company",
  "signal_subtype": "customerFeedback",
  "detected_at": "2026-10-30T22:40:41+00:00",
  "company": {
    "name": "Corning",
    "domain": "corning.com"
  },
  "data": {
    "nsfw": false,
    "stage": "none",
    "awards": 0,
    "timing": "completed",
    "topics": [
      "datacenter",
      "engineering support",
      "bom"
    ],
    "post_id": "1xjto2a",
    "summary": "A commenter praises Corning engineers for providing strong support by spending hours on the phone putting together a Bill of Materials for a first-time data center bid.",
    "category": "support",
    "comments": [
      {
        "url": "https://www.reddit.com/r/estimators/comments/1xjto2a/comment/19rwgx9d5f9s3/",
        "depth": 0,
        "score": 23,
        "author": "PancakesAlways",
        "excerpt": "Div 26 and mission critical is all I do anymore! Biggest advice is that you can’t put in enough lost time. OT fatigue, site size, trade stacking, safety, parking, so many things just drag the work down.",
        "posted_at": "2026-10-30T22:55:46.000Z",
        "author_url": "https://www.reddit.com/user/PancakesAlways/"
      },
      {
        "url": "https://www.reddit.com/r/estimators/comments/1xjto2a/comment/19rwi39z45hl0/",
        "depth": 0,
        "score": 10,
        "author": "6174gunner",
        "excerpt": "Do you know the GC well? Depending on the level of design (which is rarely complete) Have a good call with your contact at the GC and a then what they are looking for. Rough budget? Solid defendable number? Is this a real bid? Those are all very different pricing strategies and you could be stressing too much depending on what the GC is looking to get out of you.\n\n Sometimes you gotta move forward",
        "posted_at": "2026-10-30T23:21:56.000Z",
        "author_url": "https://www.reddit.com/user/6174gunner/"
      },
      {
        "url": "https://www.reddit.com/r/estimators/comments/1xjto2a/comment/19rwk15i08imd/",
        "depth": 0,
        "score": 3,
        "author": "n8pea",
        "excerpt": "Got time for RFIs? Got any manufacturer contacts? On my first one I was able to spend a couple hrs on the phone with the engineers at Corning who put the BoM together - they were happy to do it.",
        "posted_at": "2026-10-31T00:05:27.000Z",
        "author_url": "https://www.reddit.com/user/n8pea/"
      },
      {
        "url": "https://www.reddit.com/r/estimators/comments/1xjto2a/comment/19rx199py6y4i/",
        "depth": 0,
        "score": 2,
        "author": "AshamedParamedic6930",
        "excerpt": "fiber being missing is usually normal, the tenant or a separate low voltage package pulls that, but get it in writing as an exclusion or an rfi so it doesn't land on you later. for the takeoff i'd count the tray runs by tier and fittings separately, since elbows, risers and drops at each data room eat way more labor than the straight footage suggests. same for the 1000 cat6a drops, price per drop",
        "posted_at": "2026-10-31T06:31:39.000Z",
        "author_url": "https://www.reddit.com/user/AshamedParamedic6930/"
      },
      {
        "url": "https://www.reddit.com/r/estimators/comments/1xjto2a/comment/19rxrclax6kw4/",
        "depth": 0,
        "score": 2,
        "author": "Advanced-Donut9365",
        "excerpt": "I bid $1 billon.",
        "posted_at": "2026-10-31T16:16:39.000Z",
        "author_url": "https://www.reddit.com/user/Advanced-Donut9365/"
      },
      {
        "url": "https://www.reddit.com/r/estimators/comments/1xjto2a/comment/19rwlf6vqdsn6/",
        "depth": 0,
        "score": 1,
        "author": "jeffreychan3",
        "excerpt": "Inter-room ties have to be specifically called out with strand count and fiber type. Check the project manual. Sometimes the final customer has their own standards manual. If you’re under the gun, exclude it until it gets clarified. Good luck!",
        "posted_at": "2026-10-31T00:36:37.000Z",
        "author_url": "https://www.reddit.com/user/jeffreychan3/"
      },
      {
        "url": "https://www.reddit.com/r/estimators/comments/1xjto2a/comment/19ryaf2wmtf7p/",
        "depth": 0,
        "score": 1,
        "author": "TellySkier",
        "excerpt": "I’m strictly Mission Critical at this point.",
        "posted_at": "2026-10-31T23:24:11.000Z",
        "author_url": "https://www.reddit.com/user/TellySkier/"
      },
      {
        "url": "https://www.reddit.com/r/estimators/comments/1xjto2a/comment/19ryjyle9ggg5/",
        "depth": 0,
        "score": 1,
        "author": "bdubbies95",
        "excerpt": "Div 23 estimator for data centers here. I put factors up around 50%. The sites are so inefficient.\n\n Don't ever be the low bid on a data center. Be safe and comfortable. If you are too high and lose it, that's better than being low. If you are low it will be way too low.",
        "posted_at": "2026-11-01T02:58:07.000Z",
        "author_url": "https://www.reddit.com/user/bdubbies95/"
      }
    ],
    "evidence": [
      "[comment u/n8pea] On my first one I was able to spend a couple hrs on the phone with the engineers at Corning who put the BoM together - they were happy to do it."
    ],
    "virality": "somewhat_high",
    "post_date": "2026-10-30T22:40:41.000Z",
    "post_kind": "text",
    "post_text": "Division 27. We have never done a datacenter. Here are the broad strokes:\n\nMidwest location\n\n~400,000 sqft\n\n~5000' of three tiered cable tray\n\n~30 edge data rooms with 3-6 panduit floor cabinets each\n\nAPC UPS and smart PDU in each cabinet\n\nTwo tiered ladder rack in each data room\n\n~1000 cat6A cables for wifi, cameras, biometric credential readers, and staff work stations. Panduit for cable, patch panels, cable management. No mention of warranty.\n\nLiterally no mention of fiber to connect these data rooms in the plans which is weird. One of the tiers of cable tray is specifically for fiber. I'm guessing the tenants provide their own fiber in accordance to their own specifications?\n\nDoes anyone have any experience with these things? If so, what did you wish you knew before taking one on?",
    "sentiment": "positive",
    "subreddit": "estimators",
    "post_title": "I was asked to bid a data center.",
    "prominence": "aside",
    "source_url": "https://www.reddit.com/r/estimators/comments/1xjto2a/i_was_asked_to_bid_a_data_center/",
    "entity_role": "vendor",
    "post_author": "gippp",
    "upvote_ratio": 0.8,
    "mention_count": 1,
    "mention_surge": false,
    "subreddit_url": "https://www.reddit.com/r/estimators/",
    "total_upvotes": 9,
    "comments_total": 24,
    "total_comments": 24,
    "post_author_url": "https://www.reddit.com/user/gippp/",
    "signal_category": "feedback",
    "comments_included": 9
  }
}

Long text fields are shortened on this page.

Looking up one signal by its id is free. Enrich costs 2 credits per signal returned; a call with no results is free.